Marian High School

Academic and Architectural Excellence

APMA was selected to transform an existing space at Marian into a modern chemistry lab. The design incorporates extensive writable wall surfaces, consolidated storage, and includes multiple technology areas for current needs and future expansion. Marian was so happy with the end result that in 2017 it selected APMA to design an Academic Center addition and a complete renovation of classroom and communal spaces. The 8,000 SF addition, 18,600 SF renovation, and 48,500 SF refresh touched almost every space in the building and included relocating the chapel and providing a new learning commons.

Project

Location
Omaha NE

Size
136,511 SF

Scope of Work
Renovation + Addition

Date of Completion
2019

Project Contact
Audrey Buckley

The original building dedication (inscribed in an exterior wall) was preserved and can now be seen in a study room.

Marian requested an update to its existing kitchen and cafeteria which has remained mostly untouched since it’s original construction. Concepts include a totally new food delivery system that creates a college-like food hall.

Photography by: Dana Damewood

Related Projects

Office

Omaha
1516 Cuming Street
Omaha, Nebraska 68102
p: 402.341.1544
f: 402.341.4735

Red Oak
302 East Coolbaugh Street
Red Oak, Iowa 51566
p: 712.623.6888

General Inquiries

info@alleypoyner.com

Career + Co-Lab

Seraphim Mullins
smullins@alleypoyner.com

Proposals + Project Inquiries

Anne Hillen
ahillen@alleypoyner.com

Press + Advertising

Denise Powell
dpowell@alleypoyner.com

We’re Winners!

July 29, 2020

Congratulations to Swanson Elementary, which was recently honored by the IIDA Great Plains Chapter. Click the link below to see more photos and all the deserving winners!

Read More

Biophilic Landscaping

July 28, 2020

Click on the link below to read about the innovative approach to landscaping being implemented at Millwork Commons called ‘biophilic design’. Our own Megan Lutz breaks it down.

Read More

Office Update

July 23, 2020

For the continued health and safety of our clients and employees the APMA office will remain closed through October 1, 2020. Rest assured our team is focused on providing a great client experience even as we continue to work remotely during this time.

Congratulations on 30 years at APMA

June 1, 2020

For 30 years, APMA has had the pleasure of working with Martin Kluck. Martin is not only one heck of an architect, but a true friend and role model. It shows in the relationships he has built and nurtured over the years. Martin has made a lasting impression in our hearts and on the landscape of Omaha and Iowa. Congratulations, Martin!